Residential

Vineyard Cantonments

Vineyard Developers Cantonments, Accra, Ghana 2018

Project Overview

Vinyard Development – Cantonment, Accra

Under Construction

The Vinyard Development – Cantonment, Accra is a high-end project currently under construction, involving the delivery of a comprehensive MEP and integrated building systems package.

Executed by Kelm Company, the project reflects the company’s expertise in delivering advanced engineering solutions for modern developments, with a strong focus on system reliability, operational efficiency, safety, and occupant comfort.

Project Overview

The development is designed to incorporate a complete infrastructure framework combining power systems, environmental control, safety systems, and water management solutions. The integrated approach ensures that all building services operate seamlessly to support the performance and long-term sustainability of the facility.

Scope of Work

The project includes the execution and integration of:

  • Electrical works
  • Power distribution systems
  • Power station infrastructure
  • Low current systems
  • Security systems
  • Lift systems
  • HVAC systems (VRV and ventilation)
  • Smoke management systems
  • Plumbing systems
  • Fire fighting systems
  • Water filtration systems
  • Sewage treatment systems

Technical Highlights

Electrical and Power Infrastructure

Comprehensive electrical systems, including power distribution and power station infrastructure, are being implemented to ensure stable and efficient energy supply across the development.

Low Current and Security Systems

Integrated low current and security systems are being deployed to support communication, monitoring, and controlled access within the facility.

Vertical Transportation

Modern lift systems are included to ensure efficient and reliable vertical circulation throughout the building.

HVAC and Smoke Management

The project incorporates advanced HVAC systems, utilizing VRV technology and ventilation systems, along with smoke management solutions to ensure optimal indoor conditions and safety.

Plumbing, Fire Fighting, and Water Systems

Complete plumbing infrastructure, fire fighting systems, water filtration, and sewage treatment systems are being implemented to support health, safety, and sustainable resource management.

Project Value

This project demonstrates Kelm Company’s capability to deliver complex, multi-disciplinary engineering works within a single coordinated framework. The integration of core building systems ensures a high-performance environment aligned with modern development standards.

Closing Statement

The Vinyard Development – Cantonment, Accra project stands as a strong example of Kelm Company’s ability to execute high-value engineering solutions for contemporary developments, delivering reliable, efficient, and future-ready infrastructure through a fully integrated approach.

Project Details

Client
Vineyard Developers
Location
Cantonments, Accra, Ghana
Year
2018
Category
Residential
Status
Completed
Inquire About This Project Back to Projects