Under Construction
The Oxford No.01 Hotel – Osu, Accra project is a major hospitality development currently under construction, involving the delivery of a comprehensive and fully integrated MEP and building systems package.
Executed by Kelm Company, the project reflects the company’s expertise in delivering advanced engineering solutions for high-end hotel environments, where operational efficiency, guest comfort, safety, and system reliability are critical to overall performance.
The project is designed to provide a modern hospitality facility with a complete infrastructure framework, integrating power systems, HVAC, safety, water management, and smart building technologies. The scope ensures that all critical building services are aligned to support a premium hotel experience while maintaining high standards of efficiency and sustainability.
The project includes the execution and integration of:
Electrical and Power Infrastructure
Comprehensive electrical works, including power distribution and power station systems, are being implemented to ensure stable and reliable energy supply throughout the facility.
Low Current, Security, and BMS
Integrated low current systems, security infrastructure, and a centralized Building Management System (BMS) are being deployed to enhance operational control, monitoring, and overall building efficiency.
Vertical Transportation
Modern lift systems are being installed to support smooth and efficient vertical movement within the hotel.
HVAC and Smoke Management
The project includes advanced HVAC systems, combining VRV technology and ventilation systems, along with smoke management solutions to ensure occupant comfort and safety.
Plumbing, Fire Fighting, and Water Systems
Full plumbing infrastructure, fire fighting systems, water filtration, and sewage treatment systems are being implemented to support health, safety, and sustainable water management within the facility.
This project demonstrates Kelm Company’s ability to deliver complex, multi-disciplinary engineering solutions for hospitality developments. By integrating power, HVAC, safety, water, and smart systems, the project provides a robust infrastructure platform that supports both operational excellence and guest experience.
The Oxford No.01 Hotel – Osu, Accra project stands as a strong example of Kelm Company’s capability to execute high-value engineering works for premium hospitality developments. Through a fully integrated approach, the project delivers a modern, efficient, and future-ready infrastructure aligned with international hotel standards.