The Hubmart – Ikeja project involved the delivery of integrated electrical, fire protection, and HVAC systems to support the operational requirements of a modern commercial retail environment.
Executed by Kelm Company, the project reflects the company’s ability to provide dependable engineering solutions for commercial facilities, where power reliability, environmental comfort, safety, and efficient building services are essential to daily operations.
The project was designed to provide the facility with a robust technical infrastructure framework, ensuring reliable power distribution, effective fire protection, and efficient climate control systems suitable for a high-traffic commercial environment.
The project included the execution and installation of:
Electrical Infrastructure
Comprehensive electrical installations were carried out, including both medium voltage and low voltage distribution systems, to ensure stable and efficient energy delivery across the facility.
Fire Protection Systems
The project included the installation of a sprinkler fire fighting system and hose reel infrastructure, enhancing safety and supporting compliance with fire protection standards.
HVAC and Ventilation
Integrated air conditioning and ventilation systems were implemented to maintain indoor comfort, support airflow management, and ensure a functional environment for commercial operations.
This project demonstrates Kelm Company’s expertise in delivering coordinated engineering solutions for retail and commercial developments. By integrating power, fire safety, and HVAC systems, the project provided a dependable infrastructure platform that supports efficient daily operation and customer-facing environments.
The Hubmart – Ikeja project stands as a strong example of Kelm Company’s ability to deliver high-quality engineering installations for commercial facilities, combining technical performance, safety, and operational reliability within a single integrated solution.