The Data Center project for the Ministry of Telecom involved the delivery of critical MEP works designed to support a high-performance technical environment with the reliability, cooling efficiency, and power infrastructure required for continuous data center operations.
This project reflects Kelm Company’s capability to execute specialized engineering solutions for mission-critical facilities where system stability, thermal control, and dependable electrical connectivity are essential.
The project included the execution of MEP works centered around the installation and integration of a:
A high-capacity 2 x 650 Ton chilled water system was implemented to provide the cooling performance required for a controlled data center environment. This system was designed to ensure efficient thermal management and support the continuous operation of sensitive telecom and IT equipment.
Electrical ConnectionThe project also included the required electrical connection works to support the chilled water system and associated operational infrastructure, ensuring stable and reliable power delivery across the facility.
This project demonstrates Kelm Company’s expertise in delivering specialized MEP infrastructure for technically demanding environments. By integrating cooling and electrical systems within a mission-critical facility, the project contributed to improved operational reliability, equipment protection, and infrastructure performance.
The Data Center – Ministry of Telecom project stands as a strong example of Kelm Company’s engineering capability in delivering reliable and technically advanced building services for critical infrastructure. It reflects our ability to execute precision-driven MEP works in environments where performance, continuity, and system efficiency are of the highest importance.