Industrial

Coca-Cola

Coca-Cola Nigeria 2014

Project Overview

Completed in 2014

The Coca-Cola project involved the delivery of specialized HVAC works to support the operational requirements of a new production line. Designed for an industrial environment, the scope focused on providing efficient cooling, air distribution, and environmental control systems essential for performance, reliability, and process stability.

This project reflects Kelm Company’s capability to execute technically demanding HVAC solutions for industrial facilities, where system efficiency and operational continuity are critical.

Scope of Work

The HVAC package included the:

  • Supply and installation of industrial duct systems
  • Installation of a 113 KW cooling capacity Air Handling Unit (AHU)
  • Installation of a 268 KW cooling capacity chiller for the new production line

Technical Highlights

Industrial Duct Systems

Custom industrial ductwork was supplied and installed to support effective air movement and system distribution across the production environment, ensuring proper ventilation and cooling delivery.

Air Handling Unit

A 113 KW cooling capacity AHU was installed to provide controlled air handling and support stable indoor operating conditions within the facility.

Chiller System

A 268 KW cooling capacity chiller was integrated into the system to meet the cooling demands of the new production line, contributing to efficient process support and improved environmental control.

Project Value

This project demonstrates Kelm Company’s expertise in delivering industrial HVAC solutions tailored to manufacturing environments. By integrating ducting, air handling, and chiller infrastructure, the project contributed to improved production support, equipment performance, and overall facility efficiency.

Closing Statement

The Coca-Cola project stands as a strong example of Kelm Company’s ability to provide reliable and high-performance HVAC systems for industrial applications. Through precise engineering and effective system integration, the project delivered the cooling infrastructure required to support a modern production facility.

Project Details

Client
Coca-Cola
Location
Nigeria
Year
2014
Category
Industrial
Status
Completed