Healthcare

60-Bed Salaga District Hospital

Government of Ghana Salaga, Ghana 2018

Project Overview

Under Construction

The 60 Bed Salaga District Hospital project is a major healthcare infrastructure development currently under construction, involving the delivery of a comprehensive package of electrical, mechanical, public health, and low-current systems to support a modern medical facility.

Executed by Kelm Company, the project reflects the company’s ability to provide integrated engineering solutions for critical healthcare environments, where system reliability, environmental control, safety, and operational continuity are of the highest importance.

Project Overview

This project has been designed to provide the hospital with the full technical infrastructure required for effective healthcare delivery, combining essential utility systems, environmental conditioning, safety installations, and smart building management technologies.

The scope covers key systems that are fundamental to hospital operations, including power infrastructure, HVAC, fire protection, water treatment, data systems, and building automation.

Scope of Work

The project includes the execution and integration of:

  • Electrical works
  • Power stations
  • Low current systems
  • Data systems
  • Plumbing systems
  • Fire fighting systems
  • Sewage treatment systems
  • Water filtration systems
  • HVAC chilled water system
  • Complete Building Management System (BMS) network

Technical Highlights

Electrical and Power Infrastructure

The project includes comprehensive electrical works and power station infrastructure to ensure stable, safe, and dependable energy supply across all hospital operations and critical service areas.

Low Current and Data Systems

Integrated low current and data systems are being deployed to support communication, IT infrastructure, and the hospital’s technical and operational connectivity requirements.

Plumbing, Fire Fighting, and Water Systems

The project includes full plumbing systems, fire fighting systems, sewage treatment, and water filtration infrastructure, ensuring that the facility is equipped with essential public health and safety services required for healthcare operations.

HVAC Chilled Water System

A high-capacity HVAC chilled water system (3 x 220 T) is being implemented to provide efficient climate control and environmental conditioning throughout the hospital.

Building Management System (BMS)

A complete BMS network is being integrated to support centralized monitoring, control, and optimization of the building’s major engineering systems, improving operational efficiency and system oversight.

Project Value

This project demonstrates Kelm Company’s expertise in delivering complex MEP and infrastructure solutions for healthcare facilities, where technical integration, safety, and performance are essential. The combination of utility systems, environmental controls, and smart building technologies contributes to the development of a modern and fully serviced medical institution.

Closing Statement

The 60 Bed Salaga District Hospital project stands as a strong example of Kelm Company’s capability to execute high-value engineering works for critical healthcare infrastructure. Through the integration of power, HVAC, safety, water, and building management systems, the project is helping create a reliable and efficient environment that supports quality healthcare delivery.

Project Details

Client
Government of Ghana
Location
Salaga, Ghana
Year
2018
Category
Healthcare
Status
Completed
Inquire About This Project Back to Projects